Difference between revisions of "MAI2 PUMP PICTOR 3D"

From Fab Lab Bcn WIKI
Jump to: navigation, search
(Health & Safety)
(Operating the machine)
Line 27: Line 27:
  
  
*Using the pump
+
'''Using the pump'''
  
- Turn on the switch on the controller
+
- '''Step 1:''' Turn on the main switch
  
- Step 1: Turn on the main switch
+
- '''Step 2:''' Pour the mixed material into the hopper
  
- Step 2: Pour the mixed material into the hopper
+
- '''Step 3:''' Turn the Forward/Reverse Switch to FWD
  
- Step 3: Turn the Forward/Reverse Switch to FWD
+
- '''Step 4:''' Turn the Speed control to the desired speed
  
- Step 4: Turn the Speed control to the desired speed
 
  
Stopping the pump:
+
'''Stopping the pump:'''
  
- Turn on the switch on the controller
+
- '''Step 1:''' Turn the Forward/Reverse control to 0
  
- Step 1: Turn the Forward/Reverse control to 0
+
- '''Step 2:''' Turn off the main switch
 
+
- Step 2: Turn off the main switch
+
  
 
==Cleaning the machine==
 
==Cleaning the machine==

Revision as of 17:07, 19 April 2023

ABB IRB 120 (6 Axes Robot)

Technical Data

  • Operating voltage: 230V/1/N/PE/50Hz
  • Nominal power: 1,5 kW
  • Fusing: 16 A
  • Delivery rate:
  • Worm pump 24L 0S: 1,5 to 9,5 l/min infinitely adjustable
  • Worm pump 10L 0S: 0,6 to 4,0 l/min infinitely adjustable
  • L x W x H: 75 x 34 x 43 cm
  • Filling height: 75 cm
  • Total weight: 33 kg

Health & Safety

- Never run the machine dry, at least water is needed to operate the pump otherwise damage may occur.

- Never let the material fall below the minimum material level and always keep the screw under the material.

- Never disconnect the hose when there is any pressure in the pressure gauge.

Operating the machine

Using the pump

- Step 1: Turn on the main switch

- Step 2: Pour the mixed material into the hopper

- Step 3: Turn the Forward/Reverse Switch to FWD

- Step 4: Turn the Speed control to the desired speed


Stopping the pump:

- Step 1: Turn the Forward/Reverse control to 0

- Step 2: Turn off the main switch

Cleaning the machine

Step 1: Wash the hopper with clean water, rub the hopper if it is necessary

Important:

Never use any cutter or any sharp/rough tools to clean the hopper, always use the rubber tool that is provided.

Step 3: Soak a sponge ball in water.

Warning!

Never disconnect the hose when there is any pressure in the pressure gauge. Remove the remaining pressure gauge reaches 0.


Step 4: Open the hose coupling, insert the sponge ball into the hose.

Step 5: Reconnect the hose coupling

Step 6: Start pumping and wait for the sponge ball to come out of the hose.

Step 7: Grease the pump after cleaning to ensure the pump gasket is residue free.

Step 8: Ensure that the grease is pushed out of the pump gasket.

Robotic Processes

  • Pen Writing
  • Pick & Place
  • 3D Scan
  • Spraying
  • Reverse Milling (to be combined with Pick&Place application)
  • 3D printing (plastic, clay, hydrogel...)


List of video of IAAC projects using a robot :

https://vimeo.com/album/3361210

http://www.iaacblog.com/programs/courses/mrac/2018-2019-mrac/

Maintenance

Downloads

Manual:

https://search-ext.abb.com/library/Download.aspx?DocumentID=3HAC035960-001&LanguageCode=en&DocumentPartId=&Action=Launch