Difference between revisions of "ZCorp"
From Fab Lab Bcn WIKI
m |
(workflow 1) |
||
Line 13: | Line 13: | ||
==Machine workflow== | ==Machine workflow== | ||
− | * | + | *Turn on the computer |
+ | *Turn on the machine | ||
+ | *Check the binder level. Fill all four tanks with binder at least over the binder extraction pipes at the back side of the tanks. Don't fill them too much since the binder ages in the tank. | ||
+ | *Close the caps softly, don't apply pressure. | ||
+ | *Prepare the printing bed. | ||
+ | |||
+ | |||
==Important commands== | ==Important commands== |
Revision as of 09:56, 20 September 2011
Contents
Technical specifications
- Printable volume: 250mm, 350mm, 200mm (width, depth, height).
CAM
- Cam here
Tools
- Tools here
Materials and configuration
- Materials and configuration here
Machine workflow
- Turn on the computer
- Turn on the machine
- Check the binder level. Fill all four tanks with binder at least over the binder extraction pipes at the back side of the tanks. Don't fill them too much since the binder ages in the tank.
- Close the caps softly, don't apply pressure.
- Prepare the printing bed.
Important commands
- Important commands here
External links
- External links here