Difference between revisions of "ZCorp"
From Fab Lab Bcn WIKI
(workflow 1) |
(machine workflow 2) |
||
Line 13: | Line 13: | ||
==Machine workflow== | ==Machine workflow== | ||
− | *Turn on the computer | + | *Turn on the computer. |
− | *Turn on the machine | + | *Turn on the machine. |
*Check the binder level. Fill all four tanks with binder at least over the binder extraction pipes at the back side of the tanks. Don't fill them too much since the binder ages in the tank. | *Check the binder level. Fill all four tanks with binder at least over the binder extraction pipes at the back side of the tanks. Don't fill them too much since the binder ages in the tank. | ||
*Close the caps softly, don't apply pressure. | *Close the caps softly, don't apply pressure. | ||
*Prepare the printing bed. | *Prepare the printing bed. | ||
− | + | 1.Take the machine offline pressing the 'online' button. | |
+ | 2.Open the machine hood. | ||
+ | 3.Move down the material container pressing the left down arrow button and fill it with printing powder. | ||
Revision as of 10:04, 20 September 2011
Contents
Technical specifications
- Printable volume: 250mm, 350mm, 200mm (width, depth, height).
CAM
- Cam here
Tools
- Tools here
Materials and configuration
- Materials and configuration here
Machine workflow
- Turn on the computer.
- Turn on the machine.
- Check the binder level. Fill all four tanks with binder at least over the binder extraction pipes at the back side of the tanks. Don't fill them too much since the binder ages in the tank.
- Close the caps softly, don't apply pressure.
- Prepare the printing bed.
1.Take the machine offline pressing the 'online' button. 2.Open the machine hood. 3.Move down the material container pressing the left down arrow button and fill it with printing powder.
Important commands
- Important commands here
External links
- External links here